12/11/2011

PREVIOUS POST
Construction Technology This technology includes the following: removal of old plaster around the perimeter of the building to a height of 1 meter from the ground. arranged around the perimeter of the zone system with the material that forms after application of an effective permanent waterproof system without destroying the mechanical interference building structure. This may be macroporous plaster, which eliminates the infiltration of moisture coming into the room due to capillary effect. The mechanism of removal of moisture through evaporation is based on 'Effective surface area', formed by the pores within vlagovyvodyaschey plaster. As a result vlagovyvodyaschaya plaster 'pulls' and evaporates all the water present due to the capillary effect of the walls, faster than this water flows, which ensures drainage of the walls even in the most difficult cases. Vlagovyvedeniya process always continues until the complete removal of excess moisture. Due to the fact that repairs to the facades of wet brick, usually requires the replacement of old damaged plaster, this system brings significant cost savings by combining in a single process plastering and moisture protection of buildings. Using this system with anti-fungal and antibacterial activities at the expense of durability of the system will significantly reduce the cost of maintenance of buildings of historic and artistic value. When used in the residential sector, in addition to significant direct economic efficiency (increase bezremontnoy service buildings and facades), the normalization of the microbiological background, will save people's...

Recent Comments